Skip to content
Home Inspection

Home Inspection

Know your home's actual condition - before handover, purchase or renovation.

Engineering-driven snag inspection, checked room by room against a structured, international-standard checklist adapted to Indian construction - with thermal imaging built in.

  • Every room checked, not just the obvious ones
  • 2-5 business working days to your report
  • Independent of any builder

In plain language

What a home inspection actually is

It's a structured, room-by-room check-up of everything in your flat - civil finishes, electrical, plumbing, doors and windows, waterproofing, fittings - against a checklist, so defects are documented while there's still someone accountable to fix them.

01

Snag

A defect or incomplete item - a chipped tile, a misaligned door, a switch that doesn't work - flagged before you take ownership.

02

Checklist audit

A structured walkthrough against an international-standard checklist, adapted to Indian apartment construction, so nothing is left to memory.

03

Rectification

The builder or contractor fixing flagged snags, verified again before you sign off on possession or release final payment.

Structured on-site evaluation

Every room, surface and system checked against the same checklist, so the result depends on the property - not on which inspector shows up.

Thermal imaging cross-check

Wet areas and electrical points get an added thermal pass, catching hidden dampness or hot-spots the eye alone would miss - without opening anything up.

Why it matters

A flat that looks finished isn't necessarily built right

Our inspectors evaluate every room, surface and system against a structured checklist adapted to Indian construction and apartment layouts - not a quick walkthrough.

Each inspection combines expert on-site evaluation with thermal imaging, and concludes with a detailed, photo-backed snag report - so builders rectify before you sign, and you negotiate with facts.

This inspection is built for you if you're -

  • Taking possession of a new flat
  • Buying a resale property
  • A tenant or landlord at move-in or move-out
  • Auditing renovation or builder workmanship, even at scale

What's included

How the inspection runs

Four steps, in this order, on a single visit.

01

Room-by-room walkthrough

Civil finishes, electrical, plumbing, doors, windows and fittings, checked against the standard checklist.

02

Thermal cross-check

Wet areas and electrical panels scanned for dampness or hot-spots invisible to the eye.

03

Snag documentation

Every defect logged with a photo, exact location, and a severity grade.

04

Evidence-backed report

A detailed, photo-backed report you can hand straight to the builder, landlord or contractor.

When you need it

Five moments a home inspection pays for itself

Same checklist, same rigour - what changes is what's at stake.

Pre-Possession Inspection

Pre-Possession Inspection

Before you sign the possession letter on a new flat

Complete snagging before you take handover - civil finishes, doors and windows, electrical, plumbing, waterproofing, fittings - so the builder rectifies at their cost, not yours after you've moved in.

  • Civil finishes and fittings against the checklist
  • Electrical, plumbing and waterproofing
  • Doors, windows and every fitting promised on paper
Resale Property Inspection

Resale Property Inspection

Before you commit to buying an older flat

A condition assessment before you commit - including hidden dampness and ageing systems a normal viewing won't show you. You negotiate on facts, not on trust alone.

  • Structural and finish condition, room by room
  • Ageing electrical and plumbing systems
  • Hidden dampness behind fresh paint or repairs
Rental Move-In / Move-Out Inspection

Rental Move-In / Move-Out Inspection

At the start or end of a tenancy

A documented condition report that protects deposits for both tenants and owners - so nobody's guessing what damage was already there versus what happened during the tenancy.

  • Room-by-room condition report, photo-backed
  • Dated record for comparison at move-out
  • Neutral evidence both tenant and owner can rely on
Pre-Renovation / Post-Renovation Inspection

Pre-Renovation / Post-Renovation Inspection

Before work begins, or right after it's finished

Pre: know the real condition you're starting from, before you design around a hidden problem. Post: verify your contractor's workmanship independently, while you can still hold them to it - ideally before final payment.

  • Pre: existing condition and structural risk
  • Post: workmanship against the original scope
  • Best done before final payment or retention is released
Builder Quality Audit

Builder Quality Audit

For developers, builders and facility managers overseeing multiple units or a whole project

A standardized, independent audit across units before handover - not just the one flat somebody complained about. Catching gaps systematically means fewer post-handover complaints, fewer warranty claims, and a stronger handover for every buyer.

  • Sample or full-unit audits against one standard checklist
  • Civil, electrical, plumbing and waterproofing risk evaluation
  • Data-backed quality benchmarking across the project

Where we operate

Serving Mumbai-wide & neighbouring cities on request

We inspect homes and projects across Mumbai, and also take on jobs in Mumbai's neighbouring cities when asked - same checklist, same evidence-backed report, wherever the job is.

What you receive

A report that settles the argument, not starts one

Every snag is backed by a photo, graded by severity, with plain-language rectification guidance - so nobody has to take your word for it, including the builder or contractor who has to fix it.

Ask for Sample Report
Sample Proofit inspection ledger showing 52 observations, an overall property score of 88 out of 100, and a room-by-room table of contents

Before you enquire

Questions we get a lot

No - the visit itself typically takes half a day to a full day depending on the property, and strengthens your position before you sign, rather than holding anything up.

Get a quote

Tell us about the property.

Share your configuration and concern - we'll respond with a quote and available slots the same day.

  • No obligation - a quote is free
  • Same-day response
  • Report in 2-5 business working days after inspection

We use your details only to respond to this enquiry. No spam, no sharing.